Progress in Battery Park and Pier A plaza

This post has been read 2226 times!

Pier A plaza 2August 14, 2013- The slow progress with the Battery Park Conservancy redesign of the 25 acres is making slow progress. ConEd is the rate limiting step for the northern section that will connect the Hudson River Park bike path through the park to the east side.

Battery Park ConEd 2Battery Park design plansBattery Park ConEd work 1

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *